Monday, 21 November 2011

Final filming photos


We all took various photos when before, during and after filming it shows that a lot of effort has gone into the filming process and preparation before hand. We also tweeted about with Jake's costume which on the draft was just a white t shirt, in the final version the costume was a hoody which we adjusted by the strings being tied together we decided that it would be best for the hoody to be worn unzipped without the strings tied. Max also brought with him a trilby hat with him which we asked Jake to try on to see what it would look like. In the end we decide it was best not to wear it as it would change his identity too much from the draft.
Overall filming felt much less pressured as we had prepared much better and due to the more detailed shooting schedule it made each shot much easier to capture. The camera that we used to capture the pictures was my camera which is a Nikon SLR D60 it enabled us to capture a variety of different shots whilst filming.  Jake also needed some pictures for his Digipak so he took photos of Jack and I captured some of Jake playing the drums which he used in his final filming. Our front man max was easy to work with as you just needed to tell him what he needed to do  and he would do it without a problem so it was a lot easier to capture all of the lip syncing. Max had also been in some other music video so he had an idea of what he needed to do this meant his singing looked more believable.

No comments:

Post a Comment